Bank

9. Enter the dates in each subsection as the item is ordered and then received.

Disclosure Dates:
• Delivery Date-date disclosures are given to borrower(s)
• Disclosure Date: Date disclosures are drawn
• Assumed Closing Date: Estimated closing date-approx. 30 days from date of application-date will be changed to match disbursement date once determined.
Document Dates:
• Note Date: date docs are drawn/date printed on the Deed of Trust
• First Payment Due Date: first payment due date will automatically auto fill from the disbursement date, EXCEPT, for the construction/perm loans. 1st full P&I payment will begin after the construction period ends, i.e., if the loan funds on 5/20/2007, and the construction period is 10 months, the first P&I payment would be 5/1/2008. See the Construction/Perm Section for details.
Construction Only:

page_revision: 0, last_edited: 1187301915|%e %b %Y, %H:%M %Z (%O ago)
Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License